Toubani Resources Inc. (TSX-V:TRE, ASX:TRE) CEO Phil Russo speaks with Proactive after releasing the first set of results from ongoing drilling at the Kobada Gold Project in southern Mali which reveal that it has already extended mineralisation by 1 kilometre. He says the drilling was designed to test potential extensions to mineralisation at the Kobada Main Deposit. Extensive artisanal workings can be found along strike and trend from Kobada Main, yet almost no drilling has been undertaken.
Contact Details
Proactive Investors
Jonathan Jackson
+61 413 713 744